RU1000340: Installation of three gas turbines SGT-800 type at GTES “Kolomenskoe”, Moscow, Russian Federation (ex. Installation of three combined cycle gas turbine SGT-800 at GTES “Kolomenskoe”, Moscow, Russian Federation.)
Last updated 06 Jun 12
ITL project ID RU1000340
Project title Installation of three gas turbines SGT-800 type at GTES “Kolomenskoe”, Moscow, Russian Federation (ex. Installation of three combined cycle gas turbine SGT-800 at GTES “Kolomenskoe”, Moscow, Russian Federation.)
Project location Moscow region, Moscow city
Host Party Russian Federation
Other Party Netherlands
Type of Project Large Scale
Fee to be paid 20,000 USD
Sectoral scope(s) 1: Energy industries (renewable/non-renewable sources)
"Track" 1
LULUCF project No
Total Emission reductions expected 607776.0 t CO2 equivalent
Crediting period 26 May 2009 - 31 Dec 2012
Project information provided by host Party Project documentation:
PDD (1159 KB)
Determination report (1210 KB)
LoA Russia (88 KB)
LoA Netherlands (1864 KB)

Project related text:
The project’s purpose is construction of a Gas Turbine Power Plant “Kolomenskoe” with the use of natural gas as a fuel and intended for the combined production of electricity and heat. This project allows increasing the natural gas combustion efficiency and reducing СО2 emissions due to the use of modern equipment and combined heat and electricity generation.
Current status of the project Operational
Total verified emission reductions 0.0 t CO2 equivalent
Additional information (as appropriate)