RU1000300: Reconstruction of the OJSC “Nizhniy Tagil Iron and Steel Works” blast furnaces #5 and #6
Last updated 30 May 11
ITL project ID RU1000300
Project title Reconstruction of the OJSC “Nizhniy Tagil Iron and Steel Works” blast furnaces #5 and #6
Project location Nizhniy Tagil city,Sverdlovsk region, Russia
Host Party Russian Federation
Other Party
Type of Project Large Scale
Fee to be paid 20,000 USD
Sectoral scope(s) 9: Metal production
"Track" 1
LULUCF project No
Total Emission reductions expected 2121155.0 t CO2 equivalent
Crediting period 01 Jan 2008 - 31 Dec 2012
Project information provided by host Party Project documentation:
PDD_NTMK (1772 KB)
NTMK _Determination Report (1176 KB)
LoA Russia (104 KB)
NTMK_Verification Report (374 KB)

Project related text:
The project specifies reconstruction of “NTMK” BF #5 and #6 with the introduction of resource saving technologies of molten iron production. Project realization allowed shutting down BF ## 2,3 and reducing the molten iron production at BF # 1 and #4. Purpose of the project is ensuring the production of molten iron, needed for “NTMK” steelmaking operations, by a more efficient technique with lower fuel consumption. 
The project is under number 7 in the list of projects, approved by Russian Ministry of Economic development
The other party will be determined at a later stage.
Current status of the project Operational
Total verified emission reductions 1072939.0 t CO2 equivalent
Additional information (as appropriate)