Fuel switch at Yuzhno-Sakhalinsk Combined Heat and Power Plant (CHPP-1)
Last updated 15 Nov 12
ITL project ID In progress
Project title Fuel switch at Yuzhno-Sakhalinsk Combined Heat and Power Plant (CHPP-1)
Project location territory of Yuzhno-Sakhalinsk CHPP-1, the Sakhalin island, Sakhalin region, Russian Federation.
Host Party Russian Federation
Other Party United Kingdom of Great Britain and Northern Ireland
Type of Project Large Scale
Fee to be paid 20,000 USD
Sectoral scope(s) 1: Energy industries (renewable/non-renewable sources)
"Track" 1
LULUCF project No
Total Emission reductions expected 706423.0 t CO2 equivalent
Crediting period 01 Jan 2011 - 31 Dec 2012
Project information provided by host Party Project documentation:
PDD (903 KB)
Determination Report (835 KB)
LoA Russia (229 KB)
LoA UK (46 KB)

Project related text:
The project involves reconstruction of five coal-fired boilers at Yuzhno-Sakhalinsk Combined Heat and Power Plant by switching to natural gas.
Current status of the project Operational
Total verified emission reductions 0.0 t CO2 equivalent
Additional information (as appropriate)