RU1000451: Construction of new energy unit at Novosibirsk HPS 5
Last updated 16 Aug 12
ITL project ID RU1000451
Project title Construction of new energy unit at Novosibirsk HPS 5
Project location the city of Novosibirsk, Novosibirsk region, Russian Federation
Host Party Russian Federation
Other Party Switzerland
Type of Project Large Scale
Fee to be paid 20,000 USD
Sectoral scope(s) 1: Energy industries (renewable/non-renewable sources)
"Track" 1
LULUCF project No
Total Emission reductions expected 1374357.0 t CO2 equivalent
Crediting period 01 Jan 2008 - 31 Dec 2012
Project information provided by host Party Project documentation:
PDD (899 KB)
Determination report (698 KB)
LoA Russia (300 KB)

Project related text:
The project involves a construction of new energy unit № 6 at Novosibirsk HPS-5,
which includes a steam-dust coal boiler type TPE-214 Taganrog factory "Krasniy
kotel’shik," LMZ turbine T-180/210-130, generator type TGV-200-2 Municipal
Kharkov plant "Electrotyazhmash" and a full set of auxiliary equipment.
Current status of the project Operational
Total verified emission reductions 0.0 t CO2 equivalent
Additional information (as appropriate)