BE1000315: YARA Tertre Uhde 3 abatement project in Belgium
Last updated 02 Apr 12
ITL project ID BE1000315
Project title YARA Tertre Uhde 3 abatement project in Belgium
Project location BELGIUM, Walloon Region, Tertre
Host Party Belgium
Other Party France
Type of Project Large Scale
Fee to be paid 20,000 USD
Sectoral scope(s) 5: Chemical industry
"Track" 1
LULUCF project No
Total Emission reductions expected 192267.0 t CO2 equivalent
Crediting period 02 Sep 2010 - 31 Dec 2012
Project information provided by host Party Project documentation:
LoA Belgium (33 KB)
PDD (735 KB)
Final determination report (861 KB)
Letter of authorization from the Competent Authority (104 KB)

Project related text:
The main purpose of the project activity is to significantly reduce current levels of N2O emissions from the production of nitric acid and aqueous solution of manganese nitrate - Mn(NO3)2 - at YARA’s Uhde 3 nitric acid plant at Tertre in the Walloon region of Belgium.
Current status of the project Operational
Total verified emission reductions 181293.0 t CO2 equivalent
Additional information (as appropriate)