Publication of one JI PDD, Publication of one JI monitoring report and one JI verification deemed final

Publication of one JI PDD, Publication of one JI monitoring report and one JI verification deemed final

Publication of one joint implementation project design document

This message is to notify that the joint implementation (JI) project design document (PDD) for the following project has been submitted by an accredited independent entity (AIE) to the secretariat and will be open for comments as of tomorrow 07 March 2012 until 05 April 2012 (17:00 GMT):

"0319.Reconstruction of the agglomerate and blast-furnace production at the JSC «Zaporizhstal» under Track 2".

The abovementioned PDD will be available on the UNFCCC JI website under
<http://ji.unfccc.int/JI_Projects/DeterAndVerif/Verification/PDD/index.html>, where also detailed information on the submission of comments will be provided.

Paragraph 32 of the annex to decision 9/CMP.1 (JI guidelines) stipulates that, under the verification procedure under the Joint Implementation Supervisory Committee (Track 2 procedure), AIEs shall make JI PDDs publicly available through the secretariat, subject to confidentiality provisions, and receive comments from Parties, stakeholders and UNFCCC accredited observers for 30 days from the date the PDD is made publicly available.


Publication of one monitoring report

This message is to notify that an accredited independent entity (AIE) submitted to the UNFCCC secretariat a monitoring report for the following joint implementation (JI) project:

"0221. YARA Köping S2 N2O abatement project in Sweden" with the monitoring report number "002", covering the period from 01 August 2011 to 29 February 2012.

The abovementioned monitoring report is now available on the UNFCCC JI website under <http://ji.unfccc.int/JI_Projects/DeterAndVerif/Verif/MonRep.html>.

Paragraph 36 of the annex to decision 9/CMP.1 (JI guidelines) stipulates that, under the verification procedure under the Joint Implementation Supervisory Committee (Track 2 procedure), reports on reductions in emissions by sources or enhancements of removals by sinks due to JI projects shall be made publicly available.


JI verification deemed final

This message is to inform you that the period for requesting a review for a verification pertaining to the JI project "0050. Landfill methane capture and flaring at Yalta and Alushta landfills, Ukraine" for monitoring report number "002" covering the period from 01 April 2010 to 31 October 2011 has ended.

In accordance with paragraph 39 of the annex to decision 9/CMP.1 (JI guidelines), since neither a Party involved in the project nor three members of the JISC have requested a review within this period, the verification was deemed final.

The referred final verification is available on the UNFCCC JI website under:

<http://ji.unfccc.int/JI_Projects/DeterAndVerif/Verif/FinVerif.html>