Publication of one monitoring report

Publication of one monitoring report

Paragraph 36 of the annex to decision 9/CMP.1 (JI guidelines) stipulates that, under the verification procedure under the Joint Implementation Supervisory Committee (Track 2 procedure), reports on reductions in emissions by sources or enhancements of removals by sinks due to joint implementation (JI) projects shall be made publicly available.

This message is to notify that an (accredited) independent entity (IE) submitted to the UNFCCC secretariat a monitoring report for the following JI project:

"0049. Lapes Landfill Gas Utilization and Energy Generation" with the monitoring report number "001", covering the period from 01 July 2008 to 31 December 2009.

The abovementioned monitoring report is now available on the UNFCCC JI website under <http://ji.unfccc.int/JI_Projects/DeterAndVerif/Verif/MonRep.html>.