Publication of two JI monitoring reports

Publication of two JI monitoring reports

This message is to notify that an accredited independent
entity (AIE) submitted to the UNFCCC secretariat a
monitoring report for the following joint implementation
(JI) projects:

"0025. Rudaiciai Wind Power Park Project" with the
monitoring report number "005", covering the period from 01
January 2012 to 31 October 2012.

"0235. Benaiciai-1 Wind Power Project" with the monitoring
report number "002", covering the period from 01 January
2012 to 31 October 2012.

The above mentioned monitoring report is now available on
the UNFCCC JI website under
<http://ji.unfccc.int/JI_Projects/DeterAndVerif/Verif/MonRep
.html>.

Paragraph 36 of the annex to decision 9/CMP.1 (JI
guidelines) stipulates that, under the verification
procedure under the Joint Implementation Supervisory
Committee (Track 2 procedure), reports on reductions in
emissions by sources or enhancements of removals by sinks
due to JI projects shall be made publicly available.