Home
CDM
JI
CC:iNet
TT:Clear
FAQ
|
Contact us
|
Disclaimer
|
My JI
/ Login
|
Join
Eligibility Requirements
Parties Involved in JI Projects
Criteria for Baseline Setting and Monitoring
JI Supervisory Committee (JISC)
Subcommittees / Panels / Working Groups
Accredited Independent Entities (AIEs)
JI Programme of Activities
JI Projects
Project Overview
Track 2 Procedure
Calls for Public Input / Experts
Reference
Workshops / Side Events
JI News
Extranets
Your location:
JI Home
>
JI Projects
>
DB
>
BPTY5S44EIX1J50RM66G4QOACHEV2G
>
Determination
>
Switch from wet-to-dry process at Podilsky Cement, Ukraine
18:33 14 Feb 12
Project 0001 : Switch from wet-to-dry process at Podilsky Cement, Ukraine
This page shows the determination as submitted by the accredited independent entity. For the final determination click
here
Reference number
0001
Title
Project:
Switch from wet-to-dry process at Podilsky Cement, Ukraine
Host Party(ies)
Ukraine
(project participant: no)
Approval
(1541 KB)
Authorised project participants:
JSC Podilsky Cement
Authorizations:
Authorisation included in the written approval
Other Party(ies) involved
Ireland
(project participant: no)
Approval
(514 KB)
Authorised project participants:
CRH Finance Limited
Authorizations:
Authorisation included in the written approval
Scale
Large
Project category
Sectoral scope(s):
4: Manufacturing industries
PDD(s)
PDD
(1650 KB)
(A)IE chosen by the project participants for determination
TÜV SÜD Industrie Service GmbH
Determination report
Determination report
(86 KB)
Relevant documents:
Determination Report
(630 KB)
Emission reductions/enhancements of removals
(annual average in metric tonnes of CO
2
equivalent)
755,851 t CO
2
equivalent
Fee
149,670.20 USD
Period for requesting review
10 Feb 07 - 26 Mar 07 (17:00 GMT)
Crediting period
01 Jan 09 - 31 Dec 12
Project design document / determination
Publication of the project design document
"Switch from wet-to-dry process at Podilsky Cement, Ukraine"