Publication of two monitoring reports

Publication of two monitoring reports

This message is to notify that an AIE has submitted two monitoring reports to the UNFCCC secretariat for the following JI projects:

"0200. Griezpelkiu wind power park project" with the monitoring report number "001", covering the period from 01 October 2010 to 31 December 2011."
"0236. Kreivenai-III wind power park project" with the monitoring report number "001", covering the period from 01 December 2010 to 31 December 2011."

The abovementioned monitoring reports are now available on the UNFCCC JI website under <http://ji.unfccc.int/JI_Projects/DeterAndVerif/Verif/MonRep.html>.

Paragraph 36 of the annex to decision 9/CMP.1 (JI guidelines) stipulates that, under the verification procedure under the Joint Implementation Supervisory Committee (Track 2 procedure), reports on reductions in emissions by sources or enhancements of removals by sinks due to JI projects shall be made publicly available.