Project information provided by host Party |
Project documentation:
PDD_NTMK (1772 KB)
NTMK _Determination Report (1176 KB)
LoA Russia (104 KB)
NTMK_Verification Report (374 KB)
Project related text:
The project specifies reconstruction of “NTMK” BF #5 and #6 with the introduction of resource saving technologies of molten iron production. Project realization allowed shutting down BF ## 2,3 and reducing the molten iron production at BF # 1 and #4. Purpose of the project is ensuring the production of molten iron, needed for “NTMK” steelmaking operations, by a more efficient technique with lower fuel consumption.
The project is under number 7 in the list of projects, approved by Russian Ministry of Economic development
The other party will be determined at a later stage.
|