Installation of the AlfaCond Steam Condensation Systems on the Turbine-generators of the Heat and Power Plant of JSC “Avdeevskiy Coke-processing Works”
Last updated 22 Jan 13
ITL project ID In progress
Project title Installation of the AlfaCond Steam Condensation Systems on the Turbine-generators of the Heat and Power Plant of JSC “Avdeevskiy Coke-processing Works”
Project location Avdeevka town of the Donetsk Region of Ukraine
Host Party Ukraine
Other Party Switzerland
Type of Project Large Scale
Fee to be paid 20,000 USD
Sectoral scope(s) 1: Energy industries (renewable/non-renewable sources)
"Track" 1
LULUCF project No
Total Emission reductions expected 215549.0 t CO2 equivalent
Crediting period 23 Feb 2008 - 31 Dec 2012
Project information provided by host Party Project documentation:
PDD (2193 KB)
Determination Report (832 KB)
Approval Ukraine (754 KB)
Approval Switzerland (104 KB)

Project related text:
The State Environmental Investment Agency of Ukraine has confirmed this JI project under Track 1 procedure by the Order No. 9 dated January 22, 2013
Current status of the project Operational
Total verified emission reductions 0.0 t CO2 equivalent
Additional information (as appropriate)