Project information provided by host Party |
Project documentation:
PDD Komsomolskoye (1450 KB)
Determination Report_Komsomolskoye (1100 KB)
Approval Denmark (1090 KB)
Approval Russia (278 KB)
Verification report 1 (454 KB)
Verification report 2 (629 KB)
Monitoring report 1 (1670 KB)
Verification report 1 (454 KB)
Verification report 2 (629 KB)
Monitoring report 1 (1670 KB)
Monitoring report 2 (1724 KB)
Project related text:
The current JI project activity consists in the installation of a different type of APG booster compression station BCSP after the water removal unit, which will allow to increase APG pressure to 7.5 MPa, treat (dehydrate) the gas and transmit it through a new pipeline and sell it to Gazprom.
The project is under number 3 in the list of projects, approved by Russian Ministry of Economic development.
|
Connect with JI: