Project information provided by host Party |
Project documentation:
LoA (365 KB)
PDD (850 KB)
Preliminary validation report (1203 KB)
Verification report #1 (641 KB)
Verification report #2 (526 KB)
Verification report #3 (432 KB)
Verification report #4 (435 KB)
LoA Japan (80 KB)
Verification report #5 (1613 KB)
Verification report #6 (472 KB)
Verification report #7 (135 KB)
verification report 8 (1782 KB)
verification report 9 (1662 KB)
verification report 10 (1012 KB)
ERU issuance Salindres (27 KB)
External link(s) to project information:
Projets Domestiques
Project related text:
The project consists on the installation of a thermal oxidizer to destroy the greenhouse gases from the effluents of the Trifluoroacetic Acid production unit.
|
Connect with JI: