| Project information provided by host Party | Project documentation: 
  pdd_tmk (11 MB) 
  expert_opinion (1466 KB) 
  verification_report (772 KB) 
 Project related text:
 
 The purpose of this project is reconstruction of the steel-smelting manufacture of pipe plant.
The project is under number 5 in the list of projects, approved by Russian Ministry of Economic development
The other party will be determined at a later stage.
According to the russian procedure the expected emission reductions for this project 2241465.0 t CO2 equivalent was approved in the Russian registry.
 | 
			
Connect with JI: