The implementation of the combined-cycle plant at Novgorod heat and power station OJSC “TGC-2”, Russia
Last updated 28 Jun 12
ITL project ID In progress
Project title The implementation of the combined-cycle plant at Novgorod heat and power station OJSC “TGC-2”, Russia
Project location City of Veliky Novgorod, Novgorod region, Russian Federation
Host Party Russian Federation
Other Party Switzerland
Type of Project Large Scale
Fee to be paid 20,000 USD
Sectoral scope(s) 1: Energy industries (renewable/non-renewable sources)
"Track" 1
LULUCF project No
Total Emission reductions expected 171095.0 t CO2 equivalent
Crediting period 01 Jul 2011 - 31 Dec 2012
Project information provided by host Party Project documentation:
PDD (921 KB)
Determination report (1032 KB)
LoA Russia (300 KB)

Project related text:
The Project involves the installation of a GTE-160 gas turbine unit with a steam wasteheat boiler at the Novgorod HPS.
As a result of the project the new units at the Novgorod HPS built with more efficient technology will generate electric power which will replace the electric power generated by the power plants of the united power grid of the North West, which uses less effective technologies.
Current status of the project Operational
Total verified emission reductions 0.0 t CO2 equivalent
Additional information (as appropriate)