Project information provided by host Party |
Project documentation:
PDD_Koryazhma (3810 KB)
Determination Report_Koryazhma (2168 KB)
Verification Report_Koryazhma (2135 KB)
LoA Russia (278 KB)
Project related text:
The project is aimed at modernization of the Mill’s evaporation system, which is intended to reduce power consumption of the pulp production process, stabilize operation of the process equipment, mitigate negative environmental impacts and reduce greenhouse gases (GHG) emissions.
The other Party will be determined at a later stage.
|
Connect with JI: