Project information provided by host Party |
Project documentation:
LoA from Estonia (57 KB)
LoA from Sweden (34 KB)
Project Design Document (1504 KB)
Determination Report (1431 KB)
Project related text:
Wind farm with the capacity of 9 MW that will feed into the Estonian national grid a total estimated supply of 25 397 MWh per year.
|
Connect with JI: