Project information provided by host Party |
Project documentation:
Project description (32 KB)
2010 Verification Report (199 KB)
2010 Annual Report (342 KB)
2011 Annual Report (593 KB)
2012 Annual Report (723 KB)
non-host Party (Netherlands) approval of Rotokawa (149 KB)
External link(s) to project information:
New Zealand's Projects to Reduce Emissions Programme
New Zealand's Approval of the Rotokawa Geothermal Project
Media release on Nga Awa Purua (Rotokawa) Geothermal Power Station
Project related text:
Project description
The Project (also called Nga Awa Purua) has commissioned 140MW of electricity generation by utilising steam capacity from the Rotokawa geothermal field underlying the land owned by Tauhara North No. 2 Trust, Tauhara 3B Trust and Wairakei Pastoral Limited.
The Project installed a flash steam geothermal plant and generator of 140MW in capacity, which is supplied with geothermal fluid from the Rotokawa geothermal field. Generated electricity is injected into the Transpower Grid at Rotokawa connection point on the Ohaaki-Wairakei lines.
|