Project information provided by host Party |
Project documentation:
Jägala-Joa Letter of Approval (208 KB)
Jägala-Joa Project Design Document (2900 KB)
Jägala-Joa Determination Report (927 KB)
Project related text:
The proposed project activity is the restoration of a hydropower plant in Estonia at the municipality of
Jõelähtme. The hydropower plant will have a total capacity of ca. 1978 kW and the expected net output is 7,900 MWh per year. The renewable electricity produced by the hydropower plant will displace carbon intensive electricity produced from fossil fuel sources in the Estonian grid.
|
Connect with JI: