Project information provided by host Party |
Project documentation:
BTG portfolio - Verification of agreed JI project for 2002 - 2009 (2731 KB)
Project related text:
Two boilers heated by biomass (2.5 and 3.5 MW), three boiler heated by natural gas (they are now installed only as standby heat sources - 3 * 2.91 MW) and turbine with power generator (0.6 MWe). Heat Distribution by steel osolated pipeline with total lenght of 800 m.
|
Connect with JI: