Project information provided by host Party |
Project documentation:
PDD (1022 KB)
Determination Report (838 KB)
LoA Russia (300 KB)
Project related text:
The project is aimed at utilization of associated petroleum gas (APG) at a new gas-turbine power plant (GTPP) with reduction of flaring. The project is implemented at the production site of the West Salym oilfield operated by Salym Petroleum Development N.V. (SPD).
The project is configured around the construction of a 60 MW gas-turbine power plant relying on APG as fuel. The GTPP is fitted with four Titan 130 PG gas-turbine units, 15 MW each. Gas pressure generated by a gas compressor station included in the power plant configuration will be sufficient to feed the gas to the combustion chambers of gas-turbine units.
|
Connect with JI: