Project information provided by host Party |
Project documentation:
BTG portfolio - Verification of agreed JI project for 2006 - 2012 (2731 KB)
Project related text:
Two biomass boilers with total heat capacity of 4 MW (1.6 MW and 2.4 MW). The distribution system consists of backbone network of heat pipelines with bracnches to the individual streets and localities up to the delivery points, where the measuring heat-exchange stations are installed.
|
Connect with JI: