RU1000304: Yuzhno Balyksky associated gas recovery project
Last updated 16 Dec 11
ITL project ID RU1000304
Project title Yuzhno Balyksky associated gas recovery project
Project location Pyt-Yakh , Khanti-Mansiyskiy Autonomous District, Russia
Host Party Russian Federation
Other Party
Type of Project Large Scale
Fee to be paid 20,000 USD
Sectoral scope(s) 10: Fugitive emissions from fuels (solid, oil and gas)
"Track" 1
LULUCF project No
Total Emission reductions expected 9640842.0 t CO2 equivalent
Crediting period 01 Jan 2009 - 31 Dec 2012
Project information provided by host Party Project documentation:
PDD (1019 KB)
expert_opinion (191 KB)
Approval Russia (309 KB)

Project related text:
The purpose of the project is to reduce associated gas flaring and to treat it in the Yuzhno Balyksky collection and gas processing plant (hereinafter referred
to as YB-GPP), owned by JSC Sibur Holding.
The project activity consists of the installation of all necessary equipment to allow treatment of
associated petroleum gas (APG) that was previously being flared.
In absence of this project activity, all the associated gas would continue to be flared at the oil fields. The
gas recovery activity will lead to better utilisation of scarce Russian energy resources.
Current status of the project Operational
Total verified emission reductions 0.0 t CO2 equivalent
Additional information (as appropriate)