PL1000530: Avoidance of emissions in power stations through CMM utilisation on the Pniowek Coal Mine in Upper Silesian Basin, Poland. Project acronym: Pniowek-power
Last updated 03 Jan 13
ITL project ID PL1000530
Project title Avoidance of emissions in power stations through CMM utilisation on the Pniowek Coal Mine in Upper Silesian Basin, Poland. Project acronym: Pniowek-power
Project location The project is located at the coal mine Pniowek in Pawlowice in south Poland (Silesian Voivodship)
Host Party Poland
Other Party Netherlands
Type of Project Small Scale
Fee to be paid 3,000 USD
Sectoral scope(s) 10: Fugitive emissions from fuels (solid, oil and gas)
8: Mining/mineral production
"Track" 1
LULUCF project No
Total Emission reductions expected 219979.0 t CO2 equivalent
Crediting period 01 Jan 2008 - 31 Dec 2012
Project information provided by host Party Project documentation:
PDD (1478 KB)

Project related text:
In this project  CMM from the suction systems of the coal mine Pniowek should be utilised for heat and power generation for a innovative mine cooling plant.
Current status of the project Operational
Total verified emission reductions 0.0 t CO2 equivalent
Additional information (as appropriate)