Project information provided by host Party |
Project documentation:
PDD (3606 KB)
DDR (705 KB)
LoA Russia (278 KB)
Project related text:
The project envisages technical modernization and expansion of the electric arch furnace plant for steel production at the JSC Ural Steel. The proposed measures will lead to resource saving because of reduced consumption of carbon-containing materials and fuels at all stages of the steel production cycle.
The project is under number 8 in the list of projects, approved by Russian Ministry of Economic development
The other party will be determined at a later stage.
|
Connect with JI: