PL1000063: Lake Ostrowo Wind Farm
Last updated 01 Sep 09
ITL project ID PL1000063
Project title Lake Ostrowo Wind Farm
Project location
Host Party Poland
Other Party
Type of Project
Fee to be paid
Sectoral scope(s)
"Track" 1
LULUCF project No
Total Emission reductions expected 0 t CO2 equivalent
Crediting period
Project information provided by host Party Project documentation:
Letter of Approval (226 KB)

Project related text:
The purpose of the project is to produce electricity from wind turbines. The wind-generated electricity produced by the project is to displace the grid electricity (generated mainly by conventional power plants based on coal)contributing to GHG reductions within the Polish power system.
Current status of the project Unknown
Total verified emission reductions 0 t CO2 equivalent
Additional information (as appropriate)