Project information provided by host Party |
Project documentation:
PDD (1788 KB)
Determination Report (622 KB)
LoA Russia (1878 KB)
LoA UK (45 KB)
Project related text:
The project is aimed at reconstruction of Astrakhan TPP (ATPP) of LLC “LUKOIL-Astrakhanenergo” through the introduction of a modern combined-cycle power plant (CCP) with a view to enhancing efficiency, increasing electricity generation and reducing greenhouse gas (GHG) emissions. The project replaces a corresponding amount of electricity generated at the existing inefficient power generating capacities of ATPP and some electricity supplied by other grid power plants of the Integrated Energy System of the South of Russia (IES South). Besides the project also increases the proportion of heating cycle based electricity generation at the neighbouring Astrakhan CHPP-2 (ACHPP-2) also owned by LLC “LUKOIL-Astrakhanenergo”.
|
Connect with JI: