Project information provided by host Party |
Project documentation:
PDD (936 KB)
Determination report (1573 KB)
LoA Russia (300 KB)
Project related text:
The project aims at the useful utilization of associated petroleum gas (APG), which otherwise would have been burnt at CCP flares of Khokhryakovskoye field. The end project provides construction of a compressor station (CS).
This new gas pipeline and CS provide the transportation of APG under high pressure to gas processing plants (GPPs): Beloozerniy and Nizhnevartovskiy, which are located outside the project boundary. At GPPs APG is processed with the yield of a dry gas and gas liquids (GLs). Further on, at GPPs output the dry gas is supplied under high pressure to the main gas pipeline JSC «Gazprom» «Parabel-Kuzbass» for delivery to consumers.
Collecting, compressing and supplying APG to the gas pipeline will prevent APG flaring and allow, thus, to reduce greenhouse gas emissions, including CO2 (carbon dioxide) and CH4 (methane).
|
Connect with JI: