The project provides extra electricity production due to efficiency increase in water resources use in
connection with BHPP efficiency increase caused by replacement of wheels on the 6 hydro generating
units. As a result of project activity at BHPP additional 692 million kWh it will be generated a year.
The project is additional and one of the substantiations is that the existing wheels are in an operational
conditions and can serve till at least 2013.
The project activity will result in reducing electricity generation by the existing coal fired TPPs of JSC
“Irkutskenergo”.