Project information provided by host Party |
Project documentation:
PDD (1104 KB)
Determination report (1155 KB)
LoA Russia (300 KB)
Project related text:
The project involves the installation of additional generating facilities: a SGTU-420 at CHP-26, two SGTU-450 units at CHP-27 and a SGTU-450 at CHP-21.
As a result of the project, electricity will be generated at the new power-generating units constructed at OJSC “Mosenergo” using more efficient technology, which will replace the electricity
generated at the UPS Center where less efficient technologies are used, as well as heat energy which will replace the heat energy from heating stations which are less efficient in comparison with the project.
|
Connect with JI: