Project documentation:
LoA France (385 KB)
PDD (836 KB)
Determination report (1441 KB)
LoA UK (82 KB)
Verification report #1 (515 KB)
Verification report #2 (8701 KB)
ERU issuance Cristal Union (26 KB)
Project related text:
The project activity consists in the increase of energy efficiency and production capacity of alfalfa and beet pulp drying plant. New equipments are installed : condenser and low temperature dryer using steam from existing dryers to generate energy.
|
Connect with JI: