Project information provided by host Party |
Project documentation:
PDD (998 KB)
Determination report (334 KB)
Appendix1 (526 KB)
Appendix2 (408 KB)
Appendix3 (425 KB)
Appendix4 (613 KB)
Appendix5 (648 KB)
LoA Bulgaria (305 KB)
Project related text:
Reduction of greenhouse gases in Sofia Municipality by switching to natural gas from liquid and solid fuels, and electric power used by the end users and increasing the energy efficiency of their combustion installations.
The project involves construction of a gas distribution network in Sofia Municipality and restructuring of the end users’ installations in industrial, public and administrative sectors, and households.
|
Connect with JI: