Project information provided by host Party |
Project documentation:
PDD (1464 KB)
Determination report (990 KB)
LoA Russia (88 KB)
LoA Netherlands (1354 KB)
Project related text:
The purpose of the project is the reconstruction of Blast Furnace (BF) #1 at OJSC KMZ with application of contemporary technologies and equipment developed in last decades for blast furnace iron making.
|
Connect with JI: