This message is to notify that an accredited independent entity (AIE) submitted to the UNFCCC secretariat five monitoring reports for the following five joint implementation (JI) projects:

"0137. Joint Implementation project aimed at N2O emissions reduction by installation of secondary catalyst inside ammonia oxidation reactors at 3 nitric acid production plants NA2, NA3 and NA4 of Azomures SA company, situated at Târgu Mures, Romania" with the monitoring report number "003", covering the period from 05 April 2011 to 13 July 2012.

"0001. Switch from wet-to-dry process at Podilsky Cement, Ukraine" with the monitoring report number "001", covering the period from 01 October 2011 to 31 December 2011.

"0079. CMM utilisation on the Joint Stock Company named Komsomolets Donbassa Coal Mine of DTEK" with the monitoring report number "004", covering the period from 01 July 2011 to 30 June 2012.

"0211. Utilization of coke gas with electricity generation by two 6 MWe CHP at “ZaporozhCox Plant”" with the monitoring report number "003", covering the period from 01 April 2011 to 31 August 2012.

"0235. Benaiciai-1 Wind Power Project" with the monitoring report number "001", covering the period from 01 January 2011 to 31 December 2011.

The abovementioned monitoring report is now available on the UNFCCC JI website under <http://ji.unfccc.int/JI_Projects/DeterAndVerif/Verif/MonRep.html>.

Paragraph 36 of the annex to decision 9/CMP.1 (JI guidelines) stipulates that, under the verification procedure under the Joint Implementation Supervisory Committee (Track 2 procedure), reports on reductions in emissions by sources or enhancements of removals by sinks due to JI projects shall be made publicly available.

Publication of one JI verification report

In accordance with paragraph 38 of the JI guidelines, a verification pertaining to the following joint implementation (JI) project, for monitoring report number "001" covering the period from 01 October 2011 to 31 December 2011, has been submitted by an accredited independent entity (AIE) to the secretariat and will be publicly available as of tomorrow, 22 September 2012:

"0001. Switch from wet-to-dry process at Podilsky Cement, Ukraine"

The period for requesting a review will end on 06 October 2012 (17:00 GMT).

The abovementioned verification will be available on the UNFCCC JI website under <http://ji.unfccc.int/JI_Projects/DeterAndVerif/Verif/VerifRep.html>.

Paragraph 38 of the annex to decision 9/CMP.1 (JI guidelines) stipulates that, under the verification procedure under the Joint Implementation Supervisory Committee (JISC), the AIE shall make its verification publicly available through the secretariat, together with an explanation of its reasons. In accordance with paragraph 39 of the JI guidelines, a verification shall be deemed final 15 days after the date on which it is made public, unless a Party involved in the project or three JISC members request a review.