11:26 21 Nov 24
Publication of one JI monitoring report
Publication of one JI monitoring report
This message is to notify you that an accredited independent entity (AIE) submitted to the UNFCCC secretariat a monitoring report for the following JI project: "0188. Slag usage and switch from wet to dry process at Yugcement, Ukraine" with the monitoring report number "001", covering the period from 01 January 2009 to 31 March 2011. The abovementioned monitoring report is now available on the UNFCCC JI website under <http://ji.unfccc.int/JI_Projects/DeterAndVerif/Verif/MonRep.html>. Paragraph 36 of the annex to decision 9/CMP.1 (JI guidelines) stipulates that, under the verification procedure under the JISC (Track 2 procedure), reports on reductions in emissions by sources or enhancements of removals by sinks due to JI projects shall be made publicly available. |
Connect with JI: