18:09 03 Oct 24
Publication of three monitoring reports
Publication of three monitoring reports
This message is to notify that an accredited independent entity (AIE) submitted monitoring reports to the UNFCCC secretariat for the following joint implementation (JI) projects: "0064. Nitrous Oxide Emission Reduction Project at GP Nitric Acid Plant in AB Achema Fertiliser Factory" with the monitoring report number "003", covering the period from 12 July 2011 to 23 September 2012; "0089. ACHEMA UKL-7 plant N2O abatement project (0089)" with the monitoring report number "005", covering the period from 10 August 2011 to 28 August 2012; "0104. Improvement of the Energy efficiency at Energomashspetsstal (EMSS), Kramatorsk, Ukraine" with the monitoring report number "012", covering the period from 01 January 2012 to 30 June 2012. The above mentioned monitoring reports are now available on the UNFCCC JI website under <http://ji.unfccc.int/JI_Projects/DeterAndVerif/Verif/MonRep.html>. Paragraph 36 of the annex to decision 9/CMP.1 (JI guidelines) stipulates that, under the verification procedure under the Joint Implementation Supervisory Committee (Track 2 procedure), reports on reductions in emissions by sources or enhancements of removals by sinks due to JI projects shall be made publicly available. |
Connect with JI: