Publication of two JI monitoring reports and one JI verification deemed final

Publication of two JI monitoring reports and one JI verification deemed final

Publication of two JI monitoring reports

This message is to notify that an accredited independent entity (AIE) submitted to the UNFCCC secretariat two monitoring reports for the following joint implementation (JI) projects:

"0220. YARA Koping S3 N2O abatement project in Sweden" with the monitoring report number "003", covering the period from 04 January 2012 to 16 September 2012.

"0221. YARA Koping S2 N2O abatement project in Sweden" with the monitoring report number "003", covering the period from 01 March 2012 to 30 September 2012.

The abovementioned monitoring reports are now available on the UNFCCC JI website under <http://ji.unfccc.int/JI_Projects/DeterAndVerif/Verif/MonRep.html>.

Paragraph 36 of the annex to decision 9/CMP.1 (JI guidelines) stipulates that, under the verification procedure under the Joint Implementation Supervisory Committee (Track 2 procedure), reports on reductions in emissions by sources or enhancements of removals by sinks due to JI projects shall be made publicly available.


JI verification deemed final

This is to inform you that the period for requesting a review of the verification reported for "0198. Reconstruction of Units1,2,3 and 4 at Zuyevska Thermal Power Plant." for monitoring report number "003" covering the period from 01 March 2011 to 31 December 2011 has ended. In accordance with paragraph 39 of the annex to decision 9/CMP.1 (JI guidelines), since neither a Party involved in the project nor three members of the Joint Implementation Supervisory Committee (JISC) have requested a review within this period, the verification is deemed final.

The referred final verification is available on the UNFCCC JI website under:

<http://ji.unfccc.int/JI_Projects/DeterAndVerif/Verif/FinVerif.html>