22:04 26 Dec 24
Publication of one JI monitoring report
Publication of one JI monitoring report
This message is to notify that an accredited independent entity (AIE) submitted to the UNFCCC secretariat a monitoring report for the following joint implementation (JI) project: "0035. Utilization of Coal Mine Methane at the Coal Mine named after A.F. Zasyadko" with the monitoring report number "006", covering the period from 01 February 2010 to 31 July 2010. The abovementioned monitoring report is now available on the UNFCCC JI website under <http://ji.unfccc.int/JI_Projects/DeterAndVerif/Verif/MonRep.html>. Paragraph 36 of the annex to decision 9/CMP.1 (JI guidelines) stipulates that, under the verification procedure under the Joint Implementation Supervisory Committee (Track 2 procedure), reports on reductions in emissions by sources or enhancements of removals by sinks due to JI projects shall be made publicly available. |
Connect with JI: