Publication of one JI monitoring report

Publication of one JI monitoring report


This message is to notify that an accredited independent entity (AIE) submitted to the UNFCCC secretariat a monitoring report for the following JI project:

"0089. ACHEMA UKL-7 plant N2O abatement project (0089)" with the monitoring report number "002", covering the period from 04 November 2008 to 20 September 2010.

The abovementioned monitoring report is now available on the UNFCCC JI website under <http://ji.unfccc.int/JI_Projects/DeterAndVerif/Verif/MonRep.html>.

Paragraph 36 of the annex to decision 9/CMP.1 (JI guidelines) stipulates that, under the verification procedure under the Joint Implementation Supervisory Committee (Track 2 procedure), reports on reductions in emissions by sources or enhancements of removals by sinks due to JI projects shall be made publicly available.