Home   CDM   JI   CC:iNet   TT:Clear  FAQ | Contact us | Disclaimer | My JI / Login | Join

Your location: JI Home  >  JI Projects  >  Track 2 Procedure
01:10 14 Feb 12

Track 2 Procedure
 
The "Track 2" procedure is the verification procedure under the Joint Implementation Supervisory Committee (JISC), specified in paragraphs 30-45 of the JI guidelines.

This section provides detailed information on the steps of the "Track 2" procedure and the corresponding status of projects implemented under "Track 2":

Determinations

      Project Design Documents
      Determination Reports
      Reviews
      Final Determinations

Verifications

      Monitoring Reports
      Verification Reports
      Requests for Review / Reviews
      Final Verifications

(Unless otherwise indicated, the term "JI guidelines" refers to the annex of decision 9/CMP.1.)