Type of project: CO2 abatement: Fuel switch from coal to wood biomass.
Objectives: The wood wastes (bark, shavings, sawdust) produced by the Svilosa pulp, rayon and cellulose plant will be used to replace part of the coal currently used. A biomass-fired boiler will produce heat for the cellulose line at a higher efficiency than the current coal-fired boiler. The boiler has a capacity of 14 MW (18 tonnes per hour saturated steam at a pressure of between 12 and 15 bar). The planned energy input is 157,000 MWh per year, with an anticipated output 117,000 MWh per year.
|