Project documentation:
PDD (2986 KB)
Determination report (4084 KB)
Approval Russia (309 KB)
Project related text:
The project activity involves the reconstruction of two hydropower plants (HPPs) of the Nevskiy Branch HPPs that are part of the Consolidated Energy Systems (CES) of North-West in Russia. The two HPPs are the Svetogorskaya HPP and the Lesogorskaya HPP. The other party will be determined at a later stage.
|
Connect with JI: