The Reconstruction of the Electricity Grid of the “Sumyoblenergo” PJSC in Order to Lower the Electricity Transportation Loses
Last updated 17 Apr 13
ITL project ID In progress
Project title The Reconstruction of the Electricity Grid of the “Sumyoblenergo” PJSC in Order to Lower the Electricity Transportation Loses
Project location Sumy Region of Ukraine
Host Party Ukraine
Other Party Poland
Type of Project Large Scale
Fee to be paid 20,000 USD
Sectoral scope(s) 2: Energy distribution
"Track" 1
LULUCF project No
Total Emission reductions expected 1364835.0 t CO2 equivalent
Crediting period 01 Jan 2008 - 31 Dec 2012
Project information provided by host Party Project documentation:
PDD (826 KB)
Determination Report (649 KB)
Approval Ukraine (102 KB)
Approval Poland (247 KB)

Project related text:
The State Environmental Investment Agency of Ukraine has confirmed this JI project under Track 1 procedure by the Order No. 92 dated April 16, 2013
Current status of the project Operational
Total verified emission reductions 0.0 t CO2 equivalent
Additional information (as appropriate)