Project information provided by host Party |
Project documentation:
PDD (1034 KB)
Determination report (1320 KB)
LoA Russia (300 KB)
Project related text:
The result of the project is the production of heat and electric power with the application of natural gas at the CCGT unit.
In place of the steam-power facilities of the turbine unit No.3, type R-50-130/13 (capacity 50 MW) and boiler unit No.3, type TGM-88 (steam generating capacity – 420 t/h) the following new facilities are installed:
- a V94.2 Siemens gas-turbine unit with a capacity of 150MW
- a waste-heat boiler from the Machine Building Factory of the Podolsk PR-310-1.5-275
- a steam-generating set Т-30/45-145.
|
Connect with JI: