RU1000449: Installation of CCGT unit at the Dzerzhinskaya HPS, Russian Federation
Last updated 28 Jun 12
ITL project ID RU1000449
Project title Installation of CCGT unit at the Dzerzhinskaya HPS, Russian Federation
Project location City of Dzerzhinsk, Novgorod region, the Russian Federation
Host Party Russian Federation
Other Party Switzerland
Type of Project Large Scale
Fee to be paid 20,000 USD
Sectoral scope(s) 1: Energy industries (renewable/non-renewable sources)
"Track" 1
LULUCF project No
Total Emission reductions expected 2399610.0 t CO2 equivalent
Crediting period 01 Jan 2008 - 31 Dec 2012
Project information provided by host Party Project documentation:
PDD (1034 KB)
Determination report (1320 KB)
LoA Russia (300 KB)

Project related text:
The result of the project is the production of heat and electric power with the application of natural gas at the CCGT unit.
In place of the steam-power facilities of the turbine unit No.3, type R-50-130/13 (capacity 50 MW) and boiler unit No.3, type TGM-88 (steam generating capacity – 420 t/h) the following new facilities are installed:
- a V94.2 Siemens gas-turbine unit with a capacity of 150MW
- a waste-heat boiler from the Machine Building Factory of the Podolsk PR-310-1.5-275
- a steam-generating set Т-30/45-145.
Current status of the project Operational
Total verified emission reductions 0.0 t CO2 equivalent
Additional information (as appropriate)