Project documentation:
Approval Russia (278 KB)
PDD_suek (2222 KB)
Expert Conclusion_suek (284 KB)
Project related text:
The purpose of this Joint Implementation (JI) Project is combustion of methane and displacement of
conventionally produced energy. The CMM from the five coal mines recovered by ventilation and
degasification facilities will be utilized with the main purpose of thermal and electrical power production.
|
Connect with JI: