11:32 22 Dec 24
Project
0137 :
Joint Implementation project aimed at N2O emissions reduction by installation of secondary catalyst inside ammonia oxidation reactors at 3 nitric acid production plants NA2, NA3 and NA4 of Azomures SA company, situated at Târgu Mures, Romania
Reference number | 0137 |
---|---|
Title |
Project: Joint Implementation project aimed at N2O emissions reduction by installation of secondary catalyst inside ammonia oxidation reactors at 3 nitric acid production plants NA2, NA3 and NA4 of Azomures SA company, situated at Târgu Mures, Romania |
Host Party(ies) |
Romania
(project participant: no)
Approval (1577 KB) Authorised project participants: Azomures SA Authorizations: Authorisation included in the written approval |
Other Party(ies) involved |
France
(project participant: no)
Approval (558 KB) Authorised project participants: Vertis Environmental Finance Limited Authorizations: Authorisation included in the written approval |
Modalities of communication | Modalities of communication (580 KB) |
Scale | Large |
Project category |
Sectoral scope(s): 5: Chemical industry |
PDD(s) | PDD (1336 KB) |
(A)IE chosen by the project participants for determination | DNV Climate Change Services AS |
Determination report |
Determination report (716 KB) Relevant documents: F_JI_Drep (74 KB) |
Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
1,821,595 t CO2 equivalent |
Fee | 30,000.00 USD |
Period for requesting review | 21 Sep 10 - 04 Nov 10 (17:00 GMT) |
Crediting period | 24 Jul 08 - 31 Dec 12 |
Project design document / determination (history) |
Publication of the project design document
Publication of the determination report |
Monitoring / verification |
Monitoring report/verification number: 004
Publication of monitoring report(s) |
Monitoring report/verification number: 002**
Verified emission reductions/enhancements of removals: 2,474,185 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
|
Monitoring report/verification number: 001**
Verified emission reductions/enhancements of removals: 2,197,384 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
** Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.
Connect with JI: