Project information provided by host Party |
Project documentation:
non-host Party (Japan) approval of Tararua 3 (39 KB)
2008 annual report for Tararua III (423 KB)
2008 annual report verification (DNV) (1724 KB)
2009 annual report for Tararua III (1811 KB)
2010 annual report for Tararua III (755 KB)
2011 annual report for Tararua III (1325 KB)
2011 verification for Tararua III (194 KB)
2012 annual report for Tararua III (235 KB)
2012 verification of Tararua III (128 KB)
non-host Party (Netherlands) approval of Tararua 3 (383 KB)
External link(s) to project information:
New Zealand's Projects to Reduce Emissions programme
TrustPower's description of the project
New Zealand's approval of Tararua Wind Farm Stage III
Project related text:
The Tararua Wind Farm Stage III project is an expansion of stage I and stage II. Stage III consists of 31 Vestas V90 turbines each producing 3 MW. The project is in the Tararua ranges northeast of Palmerston North.
|
Connect with JI: