09:10 11 Dec 25
0187 :
Introduction of a 12,5MWe CHP with a coke plant’s flue gases utilization at the branch of ISTEK LLC “Horlivka Coke Plant
| Reference number | 0187 |
|---|---|
| Title |
Project: Introduction of a 12,5MWe CHP with a coke plant’s flue gases utilization at the branch of ISTEK LLC “Horlivka Coke Plant |
| Host Party(ies) | Ukraine |
| Scale |
Large |
| Project category |
Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) 4: Manufacturing industries |
| Crediting period | 01 Jan 10 - 31 Dec 12 |
| (A)IE chosen by the project participants for verification | Bureau Veritas Certification Holding SAS |
| Monitoring report(s) |
Monitoring report/verification number: 001
Monitoring period (as indicated in the monitoring report(s)): 01 Apr 11 - 31 Dec 11 Monitoring report(s): Monitoring report (379 KB)
|

Monitoring report
Connect with JI: