19:50 23 Nov 24
0187 :
Introduction of a 12,5MWe CHP with a coke plant’s flue gases utilization at the branch of ISTEK LLC “Horlivka Coke Plant
Reference number | 0187 |
---|---|
Title |
Project: Introduction of a 12,5MWe CHP with a coke plant’s flue gases utilization at the branch of ISTEK LLC “Horlivka Coke Plant |
Host Party(ies) | Ukraine |
Scale |
Large |
Project category |
Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) 4: Manufacturing industries |
Crediting period | 01 Jan 10 - 31 Dec 12 |
(A)IE chosen by the project participants for verification | Bureau Veritas Certification Holding SAS |
Monitoring report(s) |
Monitoring report/verification number: 001
Monitoring period (as indicated in the monitoring report(s)): 01 Apr 11 - 31 Dec 11 Monitoring report(s): Monitoring report (379 KB) |
Connect with JI: