22:42 27 Dec 24
Project
0187 :
Introduction of a 12,5MWe CHP with a coke plant’s flue gases utilization at the branch of ISTEK LLC “Horlivka Coke Plant
Reference number | 0187 | |||
---|---|---|---|---|
Title |
Project: Introduction of a 12,5MWe CHP with a coke plant’s flue gases utilization at the branch of ISTEK LLC “Horlivka Coke Plant** |
|||
Host Party(ies) |
Ukraine
(project participant: no)
Approval (2525 KB) Authorised project participants: LLC "ISTEK" Authorizations: Authorisation (2525 KB) |
|||
Other Party(ies) involved |
Netherlands
(project participant: no)
Approval (538 KB) Authorised project participants: Global Carbon BV Authorizations: Authorisation (538 KB) |
|||
Modalities of communication | Modalities of communication (427 KB) | |||
Scale | Large | |||
Project category |
Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) 4: Manufacturing industries |
|||
PDD(s) |
PDD (844 KB)
Supporting documentation: Investment Analysis (215 KB) Calculation of Emission Reductions (59 KB) Revisions to the monitoring plan:*
|
|||
(A)IE chosen by the project participants for determination | Bureau Veritas Certification Holding SAS | |||
Determination report |
Determination report (200 KB) Relevant documents: Determination Report ISTEK (1369 KB) |
|||
Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
58,316 t CO2 equivalent | |||
Fee | 10,163.20 USD | |||
Period for requesting review | 15 May 10 - 28 Jun 10 (17:00 GMT) | |||
Crediting period | 01 Jan 10 - 31 Dec 12 | |||
Project design document / determination (history) |
Publication of the project design document
Publication of the determination report |
|||
Monitoring / verification |
Monitoring report/verification number: 001**
Verified emission reductions/enhancements of removals: 46,693 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
* Amended after final determination regarding the project design document in accordance with the relevant provisions.
** Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.
Connect with JI: